Analisis Percepatan Proyek Serta Pengaruhnya Terhadap Waktu Dan Biaya Menggunakan Metode Critical Path Method (CPM) : Analysis of Project Acceleration and Its Effect on Time and Cost Using the Critical Path Method (CPM)



Maulidya Octaviani - Personal Name
Kusnul Yakin - Personal Name
Agung Saputro - Personal Name
NONE
Prodi S1 Teknik Sipil
INDONESIA
PROGRAM STUDI TEKNIK SIPIL - UNIVERSITAS DR SOETOMO
2023
SURABAYA
CONCRETE: Construction and Civil Integration Technology, Vol. 10 No. 1 April (2023) p. 27-36